| 1. | In approximately 1925, work began on the problem of suspension . 大约在1925年才开始了关于悬移质的研究。 |
| 2. | Gilbert speculates that the reason for this increase of transport rate is the reduction of friction losses by the presence of fine suspended material in the flow . 吉尔勃特认为输沙率增加的理由,是水流中存在的细悬移泥沙将减少阻力损失。 |
| 3. | Code for measurement of sus pended sediment in open channels 河流悬移质泥沙测验规范 |
| 4. | Code for measurements of suspended sediment in open channels 河流悬移质泥沙测验规范 |
| 5. | Adaptability evaluation of combined suspension support with whole roof beam 整体顶梁组合悬移支架适应性评价 |
| 6. | Analysis of the cantilever support mining and the mine pressure appearance in xixizhuang coal mine 西细庄矿悬移支架开采及矿压显现分析 |
| 7. | Exploration and practice of raising recovery rate in suspanding movable support caving working face 悬移支架放顶煤工作面提高回采率的探索与实践 |
| 8. | Based on the using state on movable support mining , the technical manage is approached 根据悬移支架开采实践过程中的情况,探讨了工作面的技术管理。 |
| 9. | Bedload is the main factor resulting in bed form for few sands of suspend load in the river bed 河床质中几乎没有悬移质颗粒,对河床演变起主要作用的是推移质泥沙。 |
| 10. | Consequently , the generalized suspended sediment concentration profile suggested by ni ( 1989 ) is derived directly from the basic governing equations 从而对倪晋仁和王光谦提出的悬移质泥沙分布的统一公式给出了理论解释。 |