| 1. | Huzhou chuangye constrcution installation engineering co . , ltd 湖州创业建筑安装工程有限公司 |
| 2. | Period of insurance for car ear 建筑安装工程一切险的保险期限 |
| 3. | Changjiang runfa group construction and installation corporation ltd 江苏长江润发集团建筑安装工程有限公司 |
| 4. | Construction work quantity 建筑安装工程量 |
| 5. | Unified standard for quality inspection and assessment of building costructional erection works 建筑安装工程质量检验评定统一标准 |
| 6. | Standard for quality inspection and assessment of buildint construction erection works container 建筑安装工程质量检验评定标准容器工程 |
| 7. | Standard for quality inspection and assessment of building construction erection works general machinery equipment 建筑安装工程质量检验说不定标准通用机械设备安装工程 |
| 8. | Standard of inspection and measurement of ray photographing for metal melting meld seam of building installation engineering 建筑安装工程金属熔化焊焊缝射线照相检测标准 |
| 9. | Standard for inspection and measurement with ray photographing for metal melting weld seam of building installation engineering 建筑安装工程金属熔化焊焊缝射线照相检测标准 |
| 10. | We will construct under the practicable state and quality requirement of client . the qualified percent of unit work up to 100 % 严格按照国家现行的《建筑安装工程施工及验收规范》和业主的质量标准施工,单位分项工程的质量评定合格率达到100 % |