Mobile
Log In Sign Up
Home > english-chinese > "底部剪力" in Chinese

Chinese translation for "底部剪力"

base shear
bottom shear


Related Translations:
底部:  bottom; bottom side; foot (pl. feet); root; [拉丁语] [解剖学] fundus 短语和例子这只烧杯的底部有些沉淀物。 there is some deposit in the bottom of the flask
底部负荷:  floor loading
底部养殖:  bottom culture
底部框架:  lower frame
垫子底部:  tassel
底部牵引力:  bottom traction
底部泥沙:  bottom sediment
底部清洗:  bottom washing
底部通道:  fondkanal
底部沉积:  bottom deposit
Example Sentences:
1.The interfacial shear stress is a constant proportion of the bottom shear .
交界面的剪力与底部剪力之比是常数。
2.The result of the new method has higher precision than that of the former . this method can be applied to the framed structures whose rigidities do not distribute equally along their heights
这种新的简化方法不仅精度比规范中的底部剪力法高,而且也适用于计算刚度沿高度分布不均匀的框架结构。
3.Shear wall will bear mostly part of horizontal force . in this case , it can satisfy the limitation of displacement , and can be insure that the bottom shear force , natural vibration period of structure and the displacement curve can be novel . furthermore , it can supply good base for proceeding design
在合理的布置下,剪力墙承担大部分水平力,使结构满足侧移限值,并使结构的底部剪力,自振周期及侧移曲线不发生异常,并为以后的工作打下良好的基础。
4.Secondly , the push - over analysis is for the three - dimensional solid element model and the plane beam element model . the total shearing force - lateral displacement curve can be obtained from it . and then the total shearing force - lateral displacement curve is converted to pseudo acceleration - period curve and some comparisons are made between the pseudo acceleration - period curve and design response spectrum
然后,建立了有限元三维实体单元模型及平面杆单元模型,对其进行了push - over分析,并将所得的底部剪力一顶点位移曲线转化为拟加速度一周期曲线,与规范反应谱进行对比,以此评定该体系的抗震能力。
5.According to the code for aseismatic design of building structure ( gbj11 - 89 ) , the seismic base - shear method has always been used to calculate the seismic response of building structures . in those structures , their weights and rigidities equally distribute along their heights which do not exceed 40m , and their deformations are mostly the shearing type ( when the structures " ratio of height and width are smaller than 4 )
我国《建筑抗震设计规范》 ( gbj11 ? 89 )中规定,对于重量和刚度沿高度分布比较均匀、高度不超过40m ,并以剪切变形为主(房屋高宽比小于4时)的结构,可采用近似计算法,即底部剪力法来计算其地震响应。
6.Second , on the base of large scale integer building model tests , anti - seismic property of structure of multi - rib panel is analyzed , and is contrasted with the property of the masonry structure . the research reveals that buildings in structure of multi - rib panel make shear deformation mainly , whose failure process is similar to the single composite panel and the tests result shows that , contracted to masonry structure , carrying capacity of buildings in this structure is 1 . 5 times and deformation capacity is about 3 times . in addition , thanks to the lower self - weight , the seismic response of the buildings is far lower than masonry structure
研究表明:多层密肋壁板结构房屋以剪切变形为主,破坏过程与单块墙板相似;复合墙板与后浇隐型框架连接成整体结构,协同工作;传统的底部剪力法适用于本结构体系的抗震计算;试验结果还表明,该结构房屋最大承载能力是砖混结构的1 . 5倍,变形能力是砖混结构的3倍左右,而房屋自重比砌体结构减少1 4以上,地震反应远低于砌体结构。
Similar Words:
"底部加强肋" Chinese translation, "底部加热" Chinese translation, "底部加热的焦炉" Chinese translation, "底部加载" Chinese translation, "底部加载天线" Chinese translation, "底部剪力法" Chinese translation, "底部剪力法(拟静力法)" Chinese translation, "底部减速开关" Chinese translation, "底部减压" Chinese translation, "底部焦油垫层" Chinese translation