Chinese translation for "峻工"
|
- fulfil
Related Translations:
峻补: powerful tonification
- Example Sentences:
| 1. | New workshop already 新车间已全面峻工 | | 2. | A ceremony was held today ( 5 october ) to mark the expansion of hong kong baptist university s au shue hung memorial library , and the opening of a 19 - metre high artgallery 浸会大学图书馆扩建工程最近峻工,为师生提供更完善的服务和更理想的学习环境。计划由 | | 3. | The import volume of crude oil stood around 63 . 42 million tons , up 3 . 9 percent while that of processed oil was 15 . 7 million tons , down 21 percent year - on - year 其中一期工程占地面积约400亩,计划于2005年底峻工,届时将达到单班生产各类客车5000辆以上的生产规模。 | | 4. | Built in 1973 for sears - roebuck & company , the sears tower was the highest building in the world until it was topped by the petronas towers in malaysia in 1996 西尔斯大厦是在1973年为西尔斯?罗巴克公司修建的,在1996年马来西亚“国油双峰塔”峻工之前,一直是世界最高的建筑。 | | 5. | This part of the project began in march 1930 and was completed in december 1931 . on 15th december 1931 the governor , sir william peel , officiated at the inauguration of the water supply scheme 上塘于1931年12月峻工,并于1931年12月15日由港督贝璐( sirwilliampeel )主持揭幕仪式。 | | 6. | In view of the difficult operating environment in china , the expansion in china had been held off , but 4 new production lines in vietnam were completed last year as scheduled . 由于中国的生产环境未如理想,集团在中国的扩产计划已暂时搁置,可是,去年在越南新增的四条生产线仍如期峻工。 | | 7. | In view of the difficult operating environment in china , the expansion in china had been held off , but 4 new production lines in vietnam were completed last year as scheduled . 由于中国的生产环境未如理想,集团在中国的扩产计划已暂时搁置,可是,去年在越南新增的四条生产线仍如期峻工。 | | 8. | Designed after japanese fujino kingo style , this 60 - meter - high building was completed in march 1918 , six years and nine months after its ground breaking on june 1 , 1912 . its construction then cost 1 . 81 million japanese yen , which was said to be six times higher than the combined cost of the lungshan temple in wanhua taipei , the chih nan temple in mucha suburban taipei and the chenghuang temple in hsinchu 总统府的建筑属藤野金吾式样,由日本建筑师长野宇平冶设计,自1912年6月1日开工建造,到1919年3月峻工费时6年9个月,总工程费高达日币181万,据闻比当时的万华山寺木栅指南宫新竹城隍庙的造价总合,还高出六倍之多。 |
- Similar Words:
- "峻翅蜡蝉科" Chinese translation, "峻次" Chinese translation, "峻次郎" Chinese translation, "峻德" Chinese translation, "峻法" Chinese translation, "峻工试验" Chinese translation, "峻工项目" Chinese translation, "峻豪水族" Chinese translation, "峻豪水族器材" Chinese translation, "峻豪水族用品厂" Chinese translation
|
|
|