Mobile
Log In Sign Up
Home > english-chinese > "实测曲线" in Chinese

Chinese translation for "实测曲线"

measured curve

Related Translations:
实测:  actual measurementobservation
实测功率:  measured power
实测英里:  measured mile
实测强度:  observed intensityobserved strength
实测水位:  measured stageobserved stageobserved water level
实测标:  half-mark
实测流:  observed current
实测径流:  measured runoff
实测辛烷值:  rated octane number
实测推力:  measured thrust
Example Sentences:
1.It provides technology means of working state real time monitoring and testing , and fault diagnosis
文中给出了3口油井的对应扭矩与转速实测曲线
2.As a result , the typical curves recorded in on - line tests are given in the summery
在课题小结部分,介绍了软件的功能,并给出了现场运行的实测曲线
3.4 . the validity of the solutions developed is verified by comparing theoretical vibration curves of pile with actually measured ones
4 、通过将理论解的导纳曲线和反射波曲线与工程桩实测曲线相比较,论证了解的正确性。
4.By comparing the simulated curve and measured curve , the field test and the simulation show that the method and results are reliable
通过现场工业试验和软件仿真,将仿真曲线与实测曲线对比,验证辨识方法可行和结果可信。
5.Seek the b ( t ) fieldwork curve and the time derivative curve dbz ( t ) / dt from the voltage decrease data generalized from field current that eliminating noise treated by wavelet ; 3
由经过小波消噪处理过的野外归一化的电压衰减数据求出b _ z ( t )实测曲线和它的时间导数曲线(
6.Meanwhile , the fitted curves of analytical solutions are compared with the field measured ones , and it is proved that the theoretical curves are in good agreement with that obtained from the field measurement
同时将本文解应用于桩基动测曲线分析工作中,通过与工程实测曲线的反演拟合和正演分析,检验了本文理论解的实用性。
7.A mathematical model of the vibration at the upper segment of a pile when there exist severe defects is put forward based on theoretical analysis , and the curve characteristics of its low strain test is described according to engineering practice under condition of transient shock
摘要从理论上给出了当基桩存在浅部严重缺陷时,在受到瞬态激振力的情形下,桩体上段振动的数学模型,并结合工程实践,描述了其低应变实测曲线的特徵。
8.2 by analysis and calculation about test result of stress , strain , and temperature of mass concrete model , and the test curve of a temperature for actual engineering , and bring up temperature of in concrete to ascend and descend function to use three theories and two pieces express
2通过对大体积混凝土试件的应力、应变与温度及实际工程的温度实测曲线的分析与计算,提出了混凝土内部的温度升降函数分别用三段和两段表达的理论。
9.Abstract : a mathematical model of the vibration at the upper segment of a pile when there exist severe defects is put forward based on theoretical analysis , and the curve characteristics of its low strain test is described according to engineering practice under condition of transient shock
文摘:从理论上给出了当基桩存在浅部严重缺陷时,在受到瞬态激振力的情形下,桩体上段振动的数学模型,并结合工程实践,描述了其低应变实测曲线的特征。
10.In order to geosteering , log - geology model of target formation should be built according to logging data and the interpreting result of wells nearby . geosteering parameters model is created to build simulative curves . compared these curves with logging curves , the position and drilling direction of the bit can be found combined with the concrete geological situation
要实现地质导向,首先要根据邻井的测井资料及其解释结果建立目标层测井地质模式,然后通过建立地质导向参数的预测模型构造相应的模拟曲线,将模拟曲线与实测曲线进行对比,结合具体地质情况,确定钻头在目标层中的位置及其钻进方向,及时调整井眼轨迹,使其始终保持在目标层中物性最好的部位。
Similar Words:
"实测平均值" Chinese translation, "实测剖面" Chinese translation, "实测气象数据" Chinese translation, "实测强度" Chinese translation, "实测倾斜" Chinese translation, "实测深度" Chinese translation, "实测输沙率" Chinese translation, "实测数据的半对数坐标曲线图" Chinese translation, "实测数量" Chinese translation, "实测数值" Chinese translation