| 1. | Construction and timbering of big section winch room 大断面绞车硐室的施工与支护 |
| 2. | Support technology of soft rock roadway with large section 大断面软岩巷道支护技术 |
| 3. | Speedy drivage of the large - bore roadway in rock formation 大断面岩巷快速施工 |
| 4. | Treatment to lost blast in grent fault drifting working face 大断面掘进工作面的丢炮治理 |
| 5. | Design and application of chamber in soft rock of deep mine 深井软岩大断面硐室的设计与应用 |
| 6. | The soft rock support technology in great fault machine head room 大断面机头硐室软岩支护技术 |
| 7. | Cable supplement support scheme and parameter on big section entry 大断面巷道锚索补强支护方案 |
| 8. | Bolting with wire mesh in soft surrounding rock and large section roadway 软岩大断面锚网支护技术 |
| 9. | Support design and construction method of great fanlt winder room 大断面绞车房的支护设计与施工方法 |
| 10. | Several pretensions on quick advancement at hard heading with big fault 大断面岩巷快速掘进的几点体会 |