Chinese translation for "大库"
|
- daiko
oko okuma okura
- Example Sentences:
| 1. | Fill in the f & b stationery form ; get enough stationery for f & b office monthly operation use from general store room 填写餐饮部文具用品申请表,从大库提取足够量的文具用品,给餐饮部日常运营工作使用。 | | 2. | On the heavy silt - laden rivers , desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head , but also for the runoff river hydropower station with lower water head 摘要在多沙河流上,无论是高坝大库的高水头电站,还是低水头河床式枢纽,电站进水口的取水排沙历来是一个倍受关注的问题。 | | 3. | Preliminary studies suggest that the mutual relations of the security , economic and risk should be adjusted and made into organic unity during determination of design flood standards for construction , the concepts on the cascade exploitation of the river should be transferred from flood control to flood management , the design flood standards for construction at the initial , middle and later stages of high dam projects should be driven up gradually according to reservoir capacity 初步研究认为,在施工洪水设计标准选择时,应处理好安全、经济和风险相互之间的关系,以达到三者有机的统一;在梯级开发河流上应实施从施工洪水控制到施工洪水管理的观念转移;高坝大库工程的初期、中期、后期三个时段的施工洪水设计标准应根据库容等指标逐步抬高。 | | 4. | In process and after the constructions of high dams and reservoirs with large storage capacity , some potential problems related to the slopes are analysed , such as high stress in the slope masses , seismic response and weakening of rockmass strength , reinforcement technique and cost , as well as the effect of flood discharge with high energy and large flow capacity on the slope stability , etc 分析了高坝大库施工和运营过程中可能出现的边坡问题,诸如边坡岩体中的高应力状态,陡峻超高边坡的地震响应,边坡岩体强度在频繁、强烈地震影响下的弱化,加固技术和高成本,以及高位能、大流量泄洪的影响等问题。 |
- Similar Words:
- "大哭失声" Chinese translation, "大哭一阵" Chinese translation, "大苦参丸" Chinese translation, "大苦湖" Chinese translation, "大苦溜溜" Chinese translation, "大库奥纳姆卡河" Chinese translation, "大库达拉" Chinese translation, "大库尔瓦" Chinese translation, "大库古利塔河" Chinese translation, "大库里" Chinese translation
|
|
|