Mobile
Log In Sign Up
Home > english-chinese > "坝顶" in Chinese

Chinese translation for "坝顶"

crest of dam
dam crest
dam top
the crest
weir crest


Related Translations:
道格拉斯坝:  douglas dam
水田坝:  shuitianba
崩坍坝:  avalanche dam
灰坝:  ash dam
坝肩:  rock dam abutment
尼龙坝:  fabridamnylon dam
鼓坝:  dmm weir dam
中坝:  zhongba
党坝:  dangba
护坝:  check dam
Example Sentences:
1.The dam gantry crane design of xixiayuan counter regulate reservoir
西霞院反调节水库工程坝顶门式启闭机设计
2.Experimental research on crest spillway flood energy dissipation for the double - curvature arch dam
双曲拱坝坝顶表孔泄洪消能布置试验研究
3.Top soil masses of dam slope soak and produce wetting more easily than low soil of slope in spite of rainfall intensity
不管降雨强度如何,坝顶和坝坡中上部比坡体的中下部更容易受降雨浸湿。
4.2 . horizontal displacement variation rules according to water level and temperature are researched by analyzing that of huangtankou concrete gravity dam . 3
通过对黄坛口混凝土坝水平位移的变化过程分析,研究了坝顶水平位移随水位、温度等环境量的变化规律。
5.The dam of mania hydroelectric project is a soil - rock dam with spreading gradation soil of core wall . the height of the dam apices is 4261 . 3m and the maximal height is 76
满拉水利枢纽工程拦河坝为宽级配砾质土心墙土石坝,坝顶高程4261 . 3m ,最大坝高76 . 3m 。
6.The dam was 2 , 352 ft . long , 178 ft . high and spanned the whole of the shek pik valley . the base was 1 , 200 ft . wide , and the top was 28 ft . , wide enough to accommodate traffic
水塘的主坝横越石壁谷,长2 , 355尺,高178尺,坝底宽1 , 200尺,坝顶宽28尺,可供汽车行驶。
7.Abstract : the articles introduce the method of china and germany ; according to their conditions of natural geography environment and technique etc , to determine crest the elevation of earth dam
摘要:文章介绍我国及德国根据自然环境、技术条件采用的确定土坝坝顶高程的方法。
8.Based on the control theory , the grey process model is built using the displacement of the dam crest and the stress of the dam heel , and the model can be used to analyze the structure behavior and stability of dams
基于控制论,建立了大坝坝顶位移和坝踵应力的灰色过程模型,并以此模型研究了大坝的结构性态。
9.Contracted with the calculations of dam in rigid foundation , the frequencies are lesson and periods of dam are lengthened because of elastic restraint of foundation . and under earthquake load , the maximum displacement of dam top is larger
与刚性地基下坝体计算结果相比,由于地基的弹性约束作用,坝体的自振频率降低,周期延长;且在地震荷载作用下,坝顶最大动位移增大。
Similar Words:
"坝的位置" Chinese translation, "坝的稳定性" Chinese translation, "坝的下游面" Chinese translation, "坝的心墙" Chinese translation, "坝的迎水坡" Chinese translation, "坝顶长度" Chinese translation, "坝顶高程" Chinese translation, "坝顶搁墙" Chinese translation, "坝顶公路" Chinese translation, "坝顶拱圈中心" Chinese translation