| 1. | Use three methods to estimate mixed - cost functions 采用三种方法来估计混合固定成本的功能。 |
| 2. | We classify costs as fixed , variable , or mixed 我们将成本分为固定成本、可变成本和混合成本。 |
| 3. | To assign a fixed cost to a task 如果要给任务分配固定成本: |
| 4. | Fixed assets shall be accounted for at historical cost as ob ? tained 固定资产应按取得是的固定成本记帐。 |
| 5. | Identify types of fixed cost 辨别固定成本的类型。 |
| 6. | Assign a fixed cost to a task 给任务分配固定成本 |
| 7. | Fixed cost = a cost that remains constant even if the task duration changes 固定成本=不随任务工期发生更改的成本 |
| 8. | 3 . in the fixed cost field , select the task , and then type the cost 3 。在“固定成本”域中,选择该任务然后输入成本。 |
| 9. | You can assign fixed costs to a task in addition to rate - based costs 您可以在基于费率的成本之外为某项任务再指定固定成本。 |
| 10. | Allocated fixed cost 分摊固定成本 |