Mobile
Log In Sign Up
Home > english-chinese > "固定周期" in Chinese

Chinese translation for "固定周期"

fixed cycle

Related Translations:
周期:  period; cycle; circle; revolution; round; complete alternation 短语和例子产业周期 industrial cycle; 经济周期 economic cycle; 商业周期 business cycle; trade cycle; 生产周期 production cycle; 再生产周期 cycle of repr
Example Sentences:
1.Regular irregularities occur with constant periodicity and are usually associated with partial heart block .
规律的不整脉随固定周期出现,而且常伴有心脏部分传导阻滞。
2.The robot will investigate whether frozen water near the martian surface might periodically melt enough to sustain a livable environment for microbes
这部机器将观察火星表面是否有可呢该固定周期融化的冰冻水来维持微生物的可居住环境。
3.The novel olt - based polling scheme has a fixed polling cycle ( 2ms ) . onu ’ s buffer receives different data packets from user , and these packets are classified and then placed into their corresponding appropriate priority queue
新算法采用olt端集中统筹控制并以固定周期2ms轮询各个onu , onu端主要控制分类缓存用户端来的不同类别业务流。
4.In the next part of this thesis , the existing bandwidth allocation algorithms are discussed in detail at first , including static bandwidth allocation algorithm and dynamic bandwidth allocation algorithm
接下来重点分析目前已有的带宽分配算法,包括固定带宽分配算法和动态带宽分配算法,在此基础上提出了一种高效的保证qos的固定周期的动态带宽分配算法。
5.Aiming at the computation intensive embedded systems with fixed periodical constraint , the thesis presents a timed task graph ( ttg ) model , which making a good lbundation of hardware / software co - synthesis and performance evaluation
针对有固定周期约束的计算密集型嵌入式系统,本文提出了带时间约束的任务流图模型( ttg ) ,为软硬件协同综合综合和评价研究奠定了良好的基础。
6.In other words , it adopts the principle of main prevention and planned examination to enhance the equipment reliability . in the water power station , whether mechanical equipments maintenance or electric equipments maintenance , the planned maintenance is adopted in the whole of maintenance in order to accomplish the production - reliability target for increasing economy benefit . the production - reliability target includes fof ( forced outage factor ) , eaf ( equivalent availability factor ) , po ( times of planned outage ) , uo ( times of unplanned outage ) etc
在水电厂,不论机械设备还是电器设备,几乎都是采用固定周期的检修或更换的处理方法预防事故的发生,完成发电企业确定的可靠性生产指标:提高机组的等效可用系数,降低强迫停运次数,减少机组的非计划停运次数(次/台年)等,从而提高企业的经济效益。
7.Chapter two and chapter three analyze the requirements of different types of enterprises , including mass production , middle and small batch production , single production . based on this , the main function frame of master production scheduling and job shop scheduling is established . four methods of drawing master production scheduling and four modes of formulating job shop scheduling are proposed , and most of them are discussed in details at aspects such as theory , realization and data store , etc . not only is it important for master production scheduling and job shop scheduling to support different types of enterprises , but also for other support functions
第二章通过对不同类型企业(包括大量生产、多品种中小批量生产、单件小批生产)的主生产计划编制方式和功能的需求分析,提出了能够适应多种生产类型企业需求的主生产计划管理子系统的总体功能框架,重点研究了分别适应不同生产类型企业需求的固定周期计划、滚动计划、零部件预投计划、投产计划等四种主生产计划编制方式,并实现了数据库的设计。
Similar Words:
"固定重复器" Chinese translation, "固定重量" Chinese translation, "固定重新订货周期制度" Chinese translation, "固定重音" Chinese translation, "固定重影" Chinese translation, "固定周期操作" Chinese translation, "固定周期长度" Chinese translation, "固定周期运算" Chinese translation, "固定轴" Chinese translation, "固定轴衬" Chinese translation