| 1. | The test research of pile foundation on nanjing underground railway 南京地铁桩基试验研究 |
| 2. | Dewatering and drainage technology for the deep foundation pit of nanjing metro 南京地铁深基坑降排水施工技术 |
| 3. | Monitoring technology of open deep excavation foundation work of nanjing metro 南京地铁明挖法深基坑工程监测技术 |
| 4. | Pressure - bearing capacity of spread foundation with reinforced aeolian sand 南京地铁软流塑地层浅埋暗挖法施工技术的探讨 |
| 5. | The concrete continuous beam in the elevated bridge of the south - north line of nanjing subway is firstly tasted in china 摘要南京地铁南北线一期工程高架区段首次在国内采用了预应力混凝土连续梁的型式。 |
| 6. | Finally , this paper cites an example to provide the scientific base for the design great - section underground structures 并对南京地铁某站进行地震响应分析,为地铁等大断面地下结构的设计提供科学的依据。 |
| 7. | This paper show the brief introduction the nanjing metro line 1 and the environment along the line , analyze the problems in the design and the construction stage 摘要介绍南京地铁1号线一期工程线路概况及沿线环境特点,通过实例对线路设计中的经验和后期施工过程中发生的问题进行分析。 |
| 8. | The construction of the south stretch of no . 1 line of nanjing subway will improve the current situation of the city ' s traffic , promote the city construction and push its economic development 摘要南京地铁一号线南延线路的建设,对改善南京交通状况、促进城市建设和经济发展具有重大意义。 |
| 9. | The waterproof method of underground continuous wall of sanshanjie station in nanjing metro is introduced , and the waterproof design and construction of the station are systematic ally summarized 通过介绍对南京地铁三山街车站前期施工的地下连续墙的防水堵漏及综合治理,系统总结三山街车站防水设计及施工。 |