| 1. | Advancement of doorhead by full section descending slicing 下行分层全断面掘进马头门 |
| 2. | Quality control of the operation of tbm full - size tunnelling machine 全断面隧道掘进机在隧道施工中的质量控制 |
| 3. | Study of ground subsidence prediction model for full section and deep mining 大采深全断面地表沉陷预测模型研究 |
| 4. | Determination of parameters of smooth wall blasting of fenghuangshan copper mine 全断面深孔光面爆破技术在窑坑隧洞中的应用 |
| 5. | Full face round 全断面掘进炮眼组 |
| 6. | Full face driving 全断面掘进 |
| 7. | Mechanism and application of whole section bolting - grouting reinforcement in soft rock tunnel 软岩巷道全断面锚注加固的力学原理与应用 |
| 8. | Through error control of full - scale sublevel driving of skip and cage shaft in xinji mine 新集矿混合立井分段平行作业全断面贯通的误差控制 |
| 9. | Research and application of the whole - section - welding technology for the produced steel box beam of cable - stayed bridge 斜拉桥钢箱梁成桥全断面焊接技术的研究与应用 |
| 10. | Open type , whole section rock tunneler is mainly used in the construction of sounding rocks with relatively better geological stratum conditions 摘要敞开式全断面岩石掘进机主要用于围岩相对较好的地质地层的施工。 |