| 1. | Application of dry filling stoping to wulong gold mine 干式充填采矿法在五龙金矿的应用 |
| 2. | Problems existing and sophisticated practice dry - filling stoping 干式充填采矿法存在问题与改进实践 |
| 3. | Practice of pre - setting laneway in underhand drift cut - and - fill stoping 下向进路式胶结充填采矿法中巷道预留技术实践 |
| 4. | Discussions on pseudo - ceiling in downward piling access back - filling mining method 下向分层进路式充填采矿法假顶护顶途径探讨 |
| 5. | Investigation on the application of electric - powered scraper in inclined wall fill mining 倾斜壁式充填采矿法中电动铲运机的应用研究 |
| 6. | Rock mechanics analysis of structural parameters of stope using back - filling method 阶段空场嗣后充填采矿法采场结构参数的岩石力学分析 |
| 7. | Application of large - scale downward cementation - filling mining method in jinchuan nickel mine 大规模下向胶结充填采矿法在金川镍矿的应用 |
| 8. | Study on the comprehensive technology of presupporting of roof and walls in tailings back - fill mining 尾砂充填采矿法采场预控顶护帮综合技术研究 |
| 9. | Application of the method of sublevel open stope mining followed by filling at xinqao pyrite mine 分段空场嗣后一次充填采矿法在新桥硫铁矿的应用 |
| 10. | A tentative plan for the improvement of sublevel open stoping with subsequent backfilling at tongkeng tin mine 改进铜坑锡矿分段空场嗣后充填采矿法的设想 |