Mobile
Log In Sign Up
Home > english-chinese > "充填体" in Chinese

Chinese translation for "充填体"

obturator

Related Translations:
松散充填:  loose pack
自充填:  self filling
充填百分率:  per cent fillpercent fill
永久性充填:  permanent filling
预防充填:  prophylactic filling
充填井:  stone shaft
充填假象:  infiltration pseudomorph
充填量:  compaction ratefill-upfilling amount
充填开采:  cut and fill miningmining with fillingmining with stowing
充填泥浆:  stowing pulp
Example Sentences:
1.The channel fill may consist of both horizontal and crossbeded sandstone .
水道充填体由水平层状和交错层状的两种砂岩组成。
2.Simulation study on the filling height for deep mining in jinchuan longshou mine
金川龙首矿深部开采充填体的充填高度模拟研究
3.An orthogonal regression experiment on the elastic module of fill in xincheng gold mine
新城金矿充填体弹性模量的正交回归试验研究
4.Stability control of packing body for gob - side entry retaining in fully - mechanized coalfaces with top - coal caving
综放沿空留巷充填体稳定性控制
5.Research on constitutive equation of damage evolution of backfill based on the full tensile and compressive process
拉压全过程充填体损伤演化本构方程研究
6.Study on packing body supporting resistance of enter - in packing for in - situ gob - side entry retaining in fully - mechanized top - coal caving mining face
综放巷内充填原位沿空留巷充填体支护阻力研究
7.On the other hand , the surface of restorative polished was necessary to improve the adhesion of plaque and to prevent the secondary caries
银汞合金充填体的菌班指数及菌落计数均低于镓合金充填体,也有高度显著性差异。
8.The application of the cemented filling technic in this mine has proven that it has such advantages as high concentration of slurry , low cost of filling and filling without dewatering , etc . , so that it is special fit to underhand drift cut - and - fill stoping
矿山应用证明,该技术具有充填浓度高、充填成本低、充填体不需脱水等显著优点,特别适合于下向进路胶结充填采矿法中应用。
9.According to the actual condition in jinchuan longshou mine , using three - dimensional numerical simulation , this paper analyzes the stresses , displacements and safety factors of mined - out area and filling body under the conditions of different filling height of down hexagon drift , and the drew conclusions provide theoretic guidance for safety mining
结合龙首矿的实际情况,利用三维数值模拟的方法对龙首矿下向六角形大断面进路不同充填高度情况下采空区及充填体的应力、位移及安全率等进行了分析研究,所得出的结论为矿山安全生产提供了理论指导。
10.The effect of overburden separation dynamic development under key stratum on grouting for bed separation space was analyzed , in order to deal with the problem that the current bed separation growing technology can not prevent the key stratum from breakage , put forward the isolated section - grouting technology for overburden bed separation space , integrated the virtue of growing for bed separation space and partial extraction , the bed separation grouting bodies , key stratum and isolated section pillars were made to constitute the load - carrying body all together , and to reach the purpose of reducing subsidence effectively , increase the coal seam extraction ratio , and accelerate the development of isolated section - growing technology for overburden bed separation space
摘要分析了关键层下离层动态发育对离层充填的影响,针对目前离层区充填工艺不能阻止覆岩关键层初次破断的问题,提出了“覆岩离层分区隔离注浆充填”技术,它综合离层充填与条带开采技术的优点,通过离层区充填置换或减小分区隔离煤柱宽度,使“离层区充填体关键层分区隔离煤柱”形成共同承载体,从而达到有效减缓地面沉降的目的,提高了煤层采出率,促进了覆岩离层充填减沉技术的发展。
Similar Words:
"充填式钢丝绳" Chinese translation, "充填术" Chinese translation, "充填树脂" Chinese translation, "充填特性" Chinese translation, "充填特性因子" Chinese translation, "充填体孔隙度" Chinese translation, "充填体内压力测定器" Chinese translation, "充填体渗透率" Chinese translation, "充填体中的空穴" Chinese translation, "充填天井" Chinese translation