| 1. | Dam joint grouting in wanjiazhai water complex 万家寨水利枢纽工程大坝接缝灌浆 |
| 2. | Planning of shanxi wanjiazhai yellow river diversion project 万家寨引黄入晋工程规划 |
| 3. | Administration bureau of wanjiazhai yellow river diversion project of shanxi province 省万家寨引黄工程管理局 |
| 4. | The application of tbm construction method in 7 tunnel of connection section of yellow river diversion project 万家寨引黄北干线1号隧洞出口段优化设计 |
| 5. | Pilot pre - grout for stopping water in blow section of tunnel , wanjiazhai yrdp yellow river diversion project 万家寨引黄工程北干线1号隧洞管片衬砌计算 |
| 6. | Water resources optimum allocation and countermeasure research in taiyuan region supplied with water by yrdp 万家寨引黄太原供水区水资源优化配置及对策 |
| 7. | Soil and water loss of shanxi wanjiazhai yellow river water diversion project and measures for prevention and control 山西省万家寨引黄工程土壤流失与防治措施 |
| 8. | Research of environmental affection on the surroundings of xiaolangdi reservoir and the settlement areas for migrants 黄河万家寨水利枢纽移民安置区水土保持初探 |
| 9. | Most part of the north trunk line of wanjiazhai yellow river delivery project has to pass through the zone of collapsible loess , so the collapsibility of the loess foundation becomes the main engineering geological problem therein 摘要山西省万家寨引黄工程北干线输水管线大部分地段通过黄土地区,黄土地基的湿陷性已成为主要的工程地质问题。 |