| 1. | What ' s the time limit for the reinspection 复验的时限是什么时候? |
| 2. | What ' s the time limit for the reinspection 复验的时限是什么时候 |
| 3. | Whats the time limit for the reinspection 复验的时限是什么时候 |
| 4. | Squatter village reinspection programme 斜坡寮屋重验计划 |
| 5. | Your shipment of goods has been found short in weight by reinspection 经复验,发现贵方发送的货物短重。 |
| 6. | The reinspection fee shall be borne by the buyers 如发现品质或数量(重量)与合同不符,买方有权向卖方索赔。 |
| 7. | If there is any discrepancy in your reinspection , please advise us within two weeks 如果你们的复检有异议,请在两周内通知我们。 |
| 8. | What if the results from the inspection and the reinspection do not coincide with each other 如果检验和复验的结果有出入该怎么办呢 |
| 9. | What if the results from the inspection and the reinspection do not coincide with each other 如果检验和复验的结果有出入该怎么办呢? |
| 10. | Contact your plumbing contractor for a reinspection to assure continuing safety 联系您的管道承包商,让其来进行检查,以确保安全得到保障。 |