| 1. | The new works were assumed to discharge the sewage effluent from an outfall approximately one kilometer off the coast . 新工程设想在离海岸约一公里的出口处排出污水流出物。 |
| 2. | Twin 1200 mm and outfall to existing nullah 位于大沟渠旁边的雨水渠2 x 1200毫米 |
| 3. | Construction of an outfall structure in west kowloon 西九拟进行排水口建造工程 |
| 4. | Hydroseeding of slope at pui o wan outfall 于贝澳湾排水口的斜坡进行喷草工程 |
| 5. | Exco endorses sewage treatment and outfall option revised 行政会议通过污水处理水平及排污口选址 |
| 6. | Constructed outfall at retaining wall 建设在护土墙的雨水渠出口 |
| 7. | Laying of temporary outfall between ka loon tsuen and tai lam kok 于嘉村与大榄角之间铺设临时去水口 |
| 8. | Completed diversion of ha wan nullah and outfall adjoining shenzhen river 已建成的下湾明渠改道及连接深圳河的排水口 |
| 9. | Operation of a sewage treatment works and a 300m long sewage submarine outfall 营办污水处理厂及300米长的海底排污管。 |
| 10. | Twin submarine outfall 双管海底排水口 |