| 1. | Main tower pylon construction - steel fixing to infill pour 建造主塔-钢筋结扎工序 |
| 2. | Infill tree planting near lung tseng tau 邻近于井头进行种植树苗 |
| 3. | Two l : 2 - scale steel frame specimens are tested on their behavior under cycle loading and some cavity sandwich panel infill specimens are tested 完成了两榀1 : 2钢框架模型试验和空腔结构砌体的材性试验。 |
| 4. | Existing research indicates that the infill walls have great effect on the capacity , stiffness and deformation behavior of frames 已有的研究表明,填充墙对框架结构的承载力、刚度及其变形性能都有着很大的影响。 |
| 5. | For the infill walls without openings , three - strut model proposed by wale are used in this thesis , and the determining method of model parameters is ameliorated 对于不开洞时的填充墙,本文采用了wale的三角撑模型,并对模型中参数的计算方法进行了改进。 |
| 6. | Influence of aspect ratio on response of infilled frames is analyzed . 3 . combining experiment with theory , a equivalent strut was used to model the stiffness of infill 利用本文提出的方法,计算了密肋复合墙板模型试件的弹性刚度,并与试验结果进行了对比,两者吻合较好。 |
| 7. | ( 3 ) furthermore , the stiffness effect induced by the infill walls makes the natural period of the frames decrease , which makes the earthquake forces put on the structures increase 3 .另外,填充墙刚度效应的存在使得结构自振周期减小,从而使作用于整个建筑上的水平地震作用增大。 |
| 8. | Extensions of parcspace along the revitalized octavia boulevard corridor fold up and into the new mixed - use infill development along the eastern and octavia ( lots m & n ) 沿着新建的欧泰维大街分隔车道, (四条)植林道一直延伸到多用途空地开发区,位在东区与欧泰维大街(亦即m & n土地区号) 。 |
| 9. | Finally , the reserves potential of untabulated reservoirs in this block , stable oil production rate - maintenance tendency after adjustment and infill drilling , and pressure build - up rate are discussed in this paper 最后对该区块的表外储层储量潜力,调整加密后的稳产趋势和压力恢复速度进行了研究。 |
| 10. | Main research work in this thesis is summarized as follows : ( 1 ) it is necessary to propose a reasonable and effective simplified model to analyze the effect of the infill walls on the frame 本文的主要工作如下: 1 .为了从理论上分析填充墙对框架结构的影响,就必须对填充墙提出一个合理、有效的计算模型。 |