| 1. | Falsework - performance requirements and general design 脚手架.性能要求和总体设计 |
| 2. | Falsework - performance requirements and general design 脚手架.性能要求和一般设计 |
| 3. | Falsework and formwork erection for stage 1 construction C2桥,第一期施工 |
| 4. | Methods of test for falsework equipment - floor centres 脚手架设备试验方法.第1部分:可调钢梁 |
| 5. | Falsework construction around pier sb42 approached viaduct - deep water region C2桥第一期建造-临时支架工程 |
| 6. | Erection of falsework for in - situ bridge deck construction at viaduct b1 兴建中的隔音屏地基兴建中的高架桥横梁 |
| 7. | Falsework - performance requirements and general design ; german version en 12812 : 2004 脚手架.性能要求和一般设计 |
| 8. | Code of practice for falsework 脚手架实用规程 |
| 9. | Erection of falsework for construction of bridge str08 near the pak kung au 邻近于伯公坳架设工作架为配合在该处兴建桥编号str08的桥面 |
| 10. | Erection of falsework for construction of bridge str17 near the wsd catchwater 邻近于长沙引水道架设工作架为配合在该处兴建桥编号str17的桥面 |