| 1. | Research on design standard of desilting basin in lift irrigated project 提灌工程沉沙池设置标准的研究 |
| 2. | Design code for desilting basin of water conservancy and hydropower projects 水利水电工程沉沙池设计规范 |
| 3. | Desilting basin , grit chamber 沉沙池沉砂池 |
| 4. | The paper also provides structural drawings of the desilting basin and the storage tank with volume of 147m ^ 3 文中提出了一个容积为147立方公尺的窑窖和沉沙池结构设计图。 |
| 5. | Water supply , drainage , river regulation and desilting in hydraulic engineering ; management stratagy consultation of water resources and flood prevention 供排水工程、河道整治工程和水利工程防淤减淤咨询、水环境和防洪信息管理决策咨询。 |
| 6. | On the heavy silt - laden rivers , desilting at the water intake of hydropower station is a problem widely concerned not only for the large reservoir with high dam and high water head , but also for the runoff river hydropower station with lower water head 摘要在多沙河流上,无论是高坝大库的高水头电站,还是低水头河床式枢纽,电站进水口的取水排沙历来是一个倍受关注的问题。 |
| 7. | Thermal - plastic rubber of pu material is adopted as the surface material , which could be used within the scope of - 70 and + 150 , and is featured by non - skid , waterproof , desilting , and snow removal etc . , and thus could ensures clean indoor environment 面料采用热塑性橡胶pu材质,可在- 70至+ 150范围内方可使用,具有防滑、防水、除泥、除雪等性能,从而保证了室内环境清洁。 |
| 8. | The sediment model tests for the desilting bottom intakes of two hydropower stations are introduced herein , in which a new combined type of " grid desilting gallery + desilting bottom intake " ( grid desilting bottom intake ) is put forward 文中介绍了2个电站进水口排沙底孔的泥沙模型试验情况,提出了一种新的“格栅式排沙廊道排沙底孔”的组合型式(简称格栅式排沙底孔) ,取得了理想的排沙效果,较好地解决了工程实际问题。 |
| 9. | On the basis of general introduction of the all - american canal system and the all - american canal irrigation district , the facilities ( dams , desilting works , irrigation canal system ) , project management and maintenance , and benefits of all - american canal system were de scribed and analyzed in detail 摘要在介绍全美灌溉系统及全美渠灌区基本概况的基础上,对全美灌溉系统的主要建筑物(水库大坝、沉沙工程、灌溉渠系) 、工程管理与维护以及工程所带来的经济效益等方面作了详细阐述与分析。 |
| 10. | The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures , such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc 分析表明,采用将放淤闸布设在弯道上段的凹岸、弯道设置溢流堰、淤沙条渠的合理分区和科学调度等措施,可以实现试验工程淤粗排细的目标。 |