| 1. | Analysis of biliuhe dam seepage observation results 碧流河水库大坝渗流观测成果分析 |
| 2. | Study on flood control forecast operation model of biliuhe reservoir 碧流河水库防洪预报调度方式研究 |
| 3. | Optimization design of intake of dalian water diversion from biliuhe reservoir 大连引碧渡槽施工的保温措施 |
| 4. | Analysis of the observation materials of biliuhe reservoir dam ' s bypass seepage 碧流河水库大坝绕坝渗流观测资料分析 |
| 5. | Analysis of phreatic line monitoring data in auxiliary dam of biliuhe reservoir 碧流河水库一副坝浸润线监测资料分析 |
| 6. | Heat insulating measures of aqueduct during construction of dalian diversion water from biliuhe reservoir 大连市引碧北段玉皇庙隧洞工程的施工管理 |
| 7. | Study on foundation treatment of dashahe siphon for water diversion project from biliuhe reservoir to dalian city 在大连市引碧玉皇庙隧洞施工中的应用 |
| 8. | The result of a case study demonstrates that the proposed flood limit water level of biliuhe reservoir can go up suitably , along with the step - by - step raise of water supply 计算结果表明,随着大连市用水量的增加,碧流河水库汛限水位可适当抬高。 |
| 9. | Taking the biliuhe reservoir as an example , the determination process of satisfied flood operation mode is systematically illustrated in this paper 随后以碧流河水库为例,详细阐述了水库防洪分类预报调度规则的确定过程,并给出了水库实时防洪预报调度的流程。 |