| 1. | Static and dynamic loading experiment and analysis of built bridge 成桥静动载试验及分析 |
| 2. | The finished bridge state is one of the cable - stayed bridge research focuses 斜拉桥成桥状态一直是人们关注和研究的重点。 |
| 3. | Minimum energy method with multi - restrictions to decide the rational completed stage force 确定斜拉桥成桥索力多约束条件下最小能量法 |
| 4. | Study of cable force optimization of completed cable - supported arch bridge of concrete - filled steel tubes 钢管混凝土拉索拱桥成桥索力优化研究 |
| 5. | Basic calculate methods for rational cable force under dead load are expounded and summarizeded 对现有的斜拉桥合理成桥索力计算方法进行阐述和总结。 |
| 6. | Thus it is a key problem to me resolved in the design of concrete cable stayed bridge 因而合理地确定斜拉桥的成桥状态,就成为设计首先要解决的关键问题。 |
| 7. | Investigation of ansys - based nonlinear optimization of bridge - completing cable force of large - span cable - stayed bridges 的大跨度斜拉桥非线性成桥索力优化研究 |
| 8. | Research and application of the whole - section - welding technology for the produced steel box beam of cable - stayed bridge 斜拉桥钢箱梁成桥全断面焊接技术的研究与应用 |
| 9. | Construction control is introduced to keep inner force and alignment of final bridge state approach to them of design 为了保证成桥状态的内力和线形与设计相符,必须进行施工控制。 |
| 10. | Cable control effect infect the shape of span arch directly , even infect the bear of weight of bridge 扣索控制的优劣直接影响着拱肋线形的好坏,从而对于成桥承载受力有着重要影响。 |