Mobile
Log In Sign Up
Home > english-chinese > "复杂地基" in Chinese

Chinese translation for "复杂地基"

complex foundation

Related Translations:
变复杂:  complicate
复杂谓语:  complex predicate
复杂晶格:  compound lattice
复杂地带:  complicated zone
复杂零件:  complex partscomplex section
复杂花纹:  intricate detail
复杂逻辑:  complex logic
复杂形式:  complex form
复杂代码:  elaborated code
复杂流体:  complex liquid
Example Sentences:
1.The application of the temped and enlarged pile without pile shoe in complex geology condition
无桩靴夯扩桩在复杂地基中的应用
2.Safety evaluation is an important and complex research subject for high arch dam on complex foundations currently
对于复杂地基上高拱坝的安全度评价至今还是一个很复杂而有待研究的问题。
3.Considered the complexity of geological structure , how to study the interaction of intake tower and slope is important both in theoretical research and engineering
如何研究在复杂地基条件下进水塔与边坡的相互作用具有重要的理论意义和工程应用价值。
4.They are inconsistent , since the two types of failure usually effect each other , it is proposed that an arch dam should be appraised according to its whole working capacity
本文建议在评价复杂地基上拱坝安全度时应以拱坝?地基系统为研究对象,以拱坝?地基系统整体工作能力作为评价依据。
5.As for high arch dams building on complex foundation , it is necessary to evaluate stability not only by 3d nonlinear finite element method but also by geomechanical model test method
对于复杂地基上建设高拱坝,应同时利用地质力学模型试验方法和三维非线性有限元方法进行研究,并相互验证。
6.Along with the westward exploitation putting into practice , many high arch dams will be built in the southwest of china where water resources are rich . more and more arch dams are building on complex foundations
随着我国西部大开发的实施,在水力资源丰富的西南地区我国将修建一大批高拱坝,在复杂地基上建坝已不鲜见。
7.Moreover , based on routine research method on abutment stability , non - linear finite element shear strengthes reducing by step iteration method is put forward in this paper , which is also applied in the analysis of abutment stability of tengzigou arch dam successfully
在此基础上,介绍了非线性有限元强度折减迭代解法,探讨了复杂地基上拱坝整体稳定安全度的评价方法,并应用于藤子沟拱坝稳定安全度评价。
8.Moreover , there are drawbacks like difficulties in stimulation , complexity of calculation and heavy work in all these models because of many other factors . for example , the complexity of the dam structure , difficulties in measuring the physical and mechanical parameters of building materials and subgrade soil , stimulating the geologic structure of subgrade , predicting effects of loads , construction and environment on the dam and so on
此外,由于大坝结构复杂,建筑材料和地基岩土的物理力学指标难以测定,复杂地基的地质构造还很难模拟,荷载、施工及环境因素对水工建筑物的影响还很难准确预测,应用各种模型都存在着模拟困难、计算复杂、工作量大等不足。
9.The effect of complex groundsill and dam body ' s construction process can be considered conveniently when finite element method is used to analyze dam body ' s stress . but there is no design criterion correspondingly because of the stress concentration that is caused by load at dam heel and dam toe under elastic state . furthermore , its value is easily affected by mesh size
有限元法分析拱坝坝体应力可以较方便地考虑复杂地基条件和坝体施工过程的影响,但是由于弹性状态下拱坝坝踵、坝趾处受荷载后的应力集中现象,而且其数值受网格尺寸影响较大,因此至今无与之相应的设计准则。
10.The power station is diversion type power station of low gate dam with a normal storage level of 1268 . 0 m , a highest gate dam level of 31 meters and a reservoir capacity of 2 , 974 , 000 cubic meters , the length of diversion tunnel of which is 19 . 57 kilometers , installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden , the foundation of which mainly consist of five overburdens which , in general , belong to multiple , complex foundation
福堂水电站位于四川省阿坝藏族羌族自治州汶川县境内的岷江河段上,电站为低闸引水式开发。正常蓄水位1268 . 0m ,最大闸高31m ,库容297 . 4万m ~ 3 ,引水隧洞长19 . 57km ,装机360mw 。福堂水电站闸坝建于深厚覆盖层基础上,基础主要存在五大覆盖层,总体属于多层复杂地基
Similar Words:
"复杂的铸件" Chinese translation, "复杂低交通量道路路面设计过程的发展" Chinese translation, "复杂地" Chinese translation, "复杂地层" Chinese translation, "复杂地带" Chinese translation, "复杂地形带" Chinese translation, "复杂地形地带" Chinese translation, "复杂地质条件" Chinese translation, "复杂雕刻型面特征造型技术的研究" Chinese translation, "复杂调节" Chinese translation