进度偏差 meaning in Chinese
schedule variance-sv
sv schedule variance
sv=schedule variance
Examples
- The recognition and analysis methods of schedule deviation
进度偏差识别与分析方法。 - The monthly report to the client shows zero schedule variance
给客户的月席报告表明进度偏差为零。 - Simultaneously , it has also suggested that the network chart with double time - axes should be applied in the course of the recognition and analysis for schedule deviation
分析了项目运行过程中进度偏差识别和分析方法;提出使用双代号时标网络图进行进度偏差识别与分析。 - This paper has discussed the driving mechanism of project task based on the workflow technology , summarized the recognition and analysis methods of schedule deviation applied to the aviation products , researched on optimization adjustment strategy of the schedule and duration - forecast technology of the project , and realized the development of prototype system
探讨了基于工作流的项目任务推动机制,论述了适合航空产品特点的进度偏差识别与分析方法,研究了进度优化调整策略和项目工期预测技术,实现了原型系统的开发。本文主要研究内容包括: 1 - At last , in order to explain the application of earned value method in actual project , this thesis brings forward an example of software exploitation , in this example , project s curve , cost and schedule windage table , performance exponential and so on are used to analyze the headway complexion of project , and some control methods are put forward
最后,为了说明挣值法在实际项目中的应用,本文列举了一个软件开发实例,实例运用项目s曲线、成本与进度偏差表、绩效指数等工具对项目进展情况进行了具体分析,并提出具体的控制措施。