进度网络 meaning in Chinese

scheduling network

Examples

  1. Risk analysis of precedence networks
    搭接进度网络完工概率分析
  2. In this paper , monte carlo ( mc ) method is used in the research of distributing of construction duration and computation of time parameter of pert network . according to probability viewpoint , critical line and key degree of activity in the network are also defined . aiming at the limitation of application of the mc in large scale the network , the simplified computational method for the network is presented with quantum probability theory and composite method of path in network
    本文用mc ( montecarlo )方法研究了施工工期的分布规律和pert ( programevaluationandreviewtechnique )网络的时间参数的计算;用概率论的观点定义了pert网络主导线路和关键度;针对大型施工进度网络mc方法应用的局限性,采用线路合成方法,引进当量概率概念,提出了pert网络的简化计算方法;根据工程搭接施工网络的特点,将其转化为广义pert网络,探讨了其施工进度风险的计算。