赶工费 meaning in Chinese
costs for acceleration measures
Examples
- 6 if the employer require the designer to delivery the design documents in advance , it should get the prior consent of the designer without serious deviation from the reasonable design circle , and the employer shall pay the crush cost
6发包人要求设计人比合同规定时间提前交付设计文件时,须征得设计人同意,不得严重背离合理设计周期,且发包人应支付赶工费。