计算负荷 meaning in Chinese
calculated load
Examples
- To reduce the computational load , these multiple linear models are then used as prediction equations in an mpc framework
为求减轻计算负荷,在模式预测控制架构中,上述之多重模式即可作为预测方程式来计算程序未来的输出值。 - This model may provide valuable inspiration in the implementation of real - time processing and the avoidance of expensive computation cost in machine vision
并且对这一设计在硬件复杂性处理精度和计算负荷方面的平衡进行了讨论。 - Compared with the traditional master - slave parallel genetic algorithms , the presented algorithm can efficiently solve the problem of unbalanced distribution of computational load among the slave computers by dynamically adjusting computational load of the slave computers
相对于常规主从式并行遗传算法,该算法通过动态调整从机的计算负荷,有效地解决了从机间计算负荷不均衡分布的问题。 - The former includes air - bearing table system , rolling base driving system , angular displacement sensing system , and two foldable flexible plates with piezoelectric patches bonded ; the latter includes sensing signal processing and actuation signal generating circuits , and computer system composed of pc and two tms320f240
整个控制系统的处理器是一个由两块tms320f240和586微机组成的主从复合系统,通过对计算负荷的合理分配,有力地保证了控制的实时性。 - Secondly , their aims are made the investment of substations , feeders or running cost of electric power system minimum . but they do n ' t take into account of land utilization , street accessibility of right of way , etc . , but demands of electric power system . generally , a straight line distance , namely , euclid distance , was used for calculating the distance between a load point and a substation , which is a straight forward but non - practical way for most planning techniques
其次受研究工具的限制,这些模型以工程投资、运行费用等最小为目标,仅能考虑导线载流量、电压降等电力系统技术约束条件,简化略去了用地限制、街道可达性等重要的自然约束条件,且求解这些模型的前奏是计算负荷点到变电所的欧几里得距离(直线距离) ,简便但不切合实际(这一点在城市电网规划中尤其重要) ,因此较难给出技术上可行的最优解。