侧壁导洞法 meaning in Chinese
side heading method
Examples
- Based on the numerical simulation , it can be concluded that the three heading construction method with the tunnel close to the mountain tunneled first should be chosen in the construction of the multi - arch loess tunnel
计算结果表明对于偏压黄土连拱随道应采用先开挖靠山一侧的侧壁导洞法进行施工。 - Considering the actual condition of this tunnel , several key mechanical problems involved in the construction of the tunnel have been studied : the comparison of three - heading construction method and benching tunneling method , and the construction sequence of the two tunnels is carried out
本文结合该工程实际,进行黄土连拱隧道的关键施工力学问题研究:正洞上下台阶法与侧壁导洞法施工方案比较研究;先左洞(靠山一侧)施工方案和先右洞施工方案的对比。