| 1. | Design for stoplog gate with high water head of temporary shiplock of tgp 三峡临时船闸高水头叠梁门设计 |
| 2. | Optimization calculation of adjustable seal in some high - head radial gate 某高水头弧门伸缩式水封选型计算 |
| 3. | Structural study on underground bifurcation of hydropower station with high pressure 高水头水电站地下埋藏式钢岔管结构研究 |
| 4. | The analysis of effects of reservoir under the high water head upon tunnel seepage flow based on geo - slope 分析高水头作用下水库对隧道的渗流影响 |
| 5. | A research on canceling telescopic joint of the penstock about the high head development near power house 取消高水头电站压力钢管近厂房段伸缩节研究 |
| 6. | Research on vibration problem of hydraulic turbines under the high head and low output operation conditions 水轮机在高水头低负荷工况下振动问题的研究 |
| 7. | Research on elastic slab vibration of inverted arch plunge pool under high water head and large discharge 高水头大流量作用下反拱水垫塘弹性单底板块振动规律研究 |
| 8. | The structure of jinping cascade 2 hydropower station is a high - head and high discharge diversion tunnel with low crown gate 锦屏二级水电站是一首部设低闸,采用长隧洞引水的高水头、大流量的引水式电站。 |
| 9. | It is suitable for unit with a water head higher than 500 meters , and it has been successfully used in the units with a water head of 600 - 800 meters 适用于500米以上的高水头机组,已分别在600 - 800米水头段的机组中成功使用。 |
| 10. | It concludes that percolation of roller compact concrete is of self - compactness by time effect under continuous action of water head and there may exist partial darcy flow regime in roller compact concrete under high water head 认为在持续水头作用下,碾压混凝土的渗透具有时效自密性;高水头作用下的碾压混凝土可能存在偏达西流现象。 |