| 1. | Technical code of key dam for soil and water conservation 水土保持治沟骨干工程技术规范 |
| 2. | Building vital projects to make full use of river basin benefits 建设龙头骨干工程发挥流域梯级效益 |
| 3. | Energy dissipation and erosion control of stepped overflow structure on key dam of gully correction 治沟骨干工程台阶式泄水建筑物的消能防冲研究 |
| 4. | Suggestions on quality supervising and management of key gully control works for soil and water conservation 关于水保治沟骨干工程质量监督管理工作的建议 |
| 5. | West - east electricity transmitting project is great decision - making and mark project to implement the western development “西电东送”是国家实施西部大开发战略作出的重大决策和标志性工程,也是西部大开发的骨干工程。 |
| 6. | The three gorges hydropower and water conoervancy project is the largest hydropower station in the world after completion of gezhouba hydropower station on the changjiangriver 摘要三峡水利枢纽是继葛洲坝水利枢纽建成后在长江上修建的世界第一大水电站,规模宏大,举世瞩目,具有巨大的防洪、发电、航运等综合效益,是开发治理长江的骨干工程。 |
| 7. | The urgency and necessity of development of three key future projects , daliushu , qikou and guxian , in the yellow river are analyzed in the paper through combination with consideration of the requirement for implementation of western china development strategy 结合我国实施西部大开发战略的要求,分析了黄河待建的大柳树、碛口、古贤三座骨干工程开发的必要性和迫切性。 |
| 8. | The jiangkou hydropower station that is now under construction is the largest hydropower project on the main stream of the furong river . it ' s the most important electricity energe source of chongqing in the 21 century and it also be the main project of the big develop of western 江口水电站是重庆21世纪重要电力能源供应基地,是西部大开发的一项骨干工程,也是乌江支流之一的芙蓉江干流上最大的在建水电工程,目前该工程正在紧张的施工之中。 |
| 9. | The situation of yellow river dry - up is gradually rigorous . it has being influenced the development of the lower reaches of yellow river and the implement of strategy on developing the western areas . based on analyzing the harmfulness , causes of its dry - up from the factors of physical geography and human activities , this article put forward the engineering and non - engineering control measures for controlling yellow river dry - up : strenghtening the unified management and despatch for its water resource ; resorting to compulsion to save water ; quickening key projects duild for the addition of balance and water storing capacity ; increasing synthetical administer to ecological environment ; increasing effectivesupply of water resource 黄河断流形势日趋严峻,断流的频率增加、时间延长、里程增大,严重制约了黄河流域尤其是黄河下游地区的可持续发展和开发大西部战略的实施.在分析黄河断流造成的危害、黄河断流的自然因素和人为因素的基础上,提出了加强黄河水资源的统一管理和调度、采取强制措施厉行节约用水、加快骨干工程建设增加调蓄能力、加大流域生态环境综合治理的力度、适时开源增加水资源的有效供给等工程性和非工程性措施,以防治黄河的断流 |
| 10. | Eight key projects are brought forward for constructing evergreen grassland stockbreeding , they are : 1 ) leadoff enterprise and famous trademark cultivation project ; 2 ) breed of forage grass , fine breed of livestock and poultry project ; 3 ) grassland construction and forage planting project ; 4 ) raw product base construction project ; 5 ) prevention and cure of animal epidemic disease and service project ; 6 ) livestock product security project ; 7 ) science and technology , talent cultivation project ; 8 ) network information project 提出了建设常绿草地畜牧业基地的8大骨干工程,即龙头企业与知名品牌培育工程、牧草种子与畜禽良种工程、草地建设与饲料种植工程、初级产品基地工程、动物疫病防治与服务工程、畜产品安全工程、科技与人才工程、网络信息工程。 |