English translation for "验收证书"
|
- acceptance certificate
acceptanec certificate act of reception certificate of acceptance
Related Translations:
验收: check and accept; check before acceptance; check upon delivery; acceptance check; control reception 短语和例子逐项验收 check item by item before acceptance; 验收单 receipt; 验收合格证 acceptance certificat 验收量规: acceptance gage, acceptance gaugeacceptance gauge 验收项目: items for acceptance 验收工程师: inspecting engineer 验收试航: acceptance test trial trip 共同体验收: community type-approval 验收设备: acceptance checkout equipment
- Example Sentences:
| 1. | Signing of the acceptance certificate entitles the seller to full and immediate payment 签署验收证书使得卖方有权获得全额和立即的付款。 | | 2. | H . one original equipment acceptance certificate signed and affixed by the end - user and the seller 由最终用户和卖方签章的设备验收证书正本一份。 | | 3. | 2 a guarantee period of 12 months shall start from the date of equipment acceptance certificate or 14 months start from the date of b / l , whichever comes earlier 质保期应为设备验收证书签署之日起12个月,或海运提单日后14个月,以先到者为准。 | | 4. | The warranty period shall be 12 months counting from the date on which the buyer , the end - user and the seller sign the certificate of final acceptance of the contract goods 保证期自买方,最终用户和卖方签署合同货物最终验收证书之日起十二个月。 | | 5. | 4 on successful completion of the acceptance test of the contract equipment , the acceptance of the contract equipment shall be granted in the form of equipment acceptance certificate signed by representatives of concerning parties 合同设备验收测试成功,有关方面代表即应签署设备验收证书以示对合同设备的接受。 | | 6. | Insurance time limit is cast oneself protect a project to begin construction or be used at be sure in building site when the material of the project , equipment transfers building site , rise , sign and issue to part or whole project to project everybody finishing check and accept certificate or check and accept qualification , project everybody is had actually or perhaps be used or receive this share or stop when whole project , with the person that happen first is accurate 保险期限自投保工程在工地动工或用于被保险工程的材料、设备运抵工地之时起,至工程所有人对部分或全部工程签发完工验收证书或验收合格,或者工程所有人实际占有或使用或接收该部分或全部工程时止,以先发生者为准。 |
- Similar Words:
- "验收噪声水平" English translation, "验收站" English translation, "验收丈量" English translation, "验收证,验收单" English translation, "验收证明书" English translation, "验收值" English translation, "验收指标" English translation, "验收制度" English translation, "验收质量" English translation, "验收质量标准" English translation
|
|
|