| 1. | The reforming zeal of hollingsworth is only one step short of the madness of rappaccini . 霍林沃斯热衷于改革,只差一点就变成拉帕西尼之疯狂。 |
| 2. | Evolution and driving mechanism of runoff of huolin river 霍林河流域生态环境需水量研究 |
| 3. | Impact of reservoir project on downstream wetlands of huolin river 水利工程对霍林河下游湿地的影响 |
| 4. | Application of springing blasting method in huolinhe open - pit mine 药壶爆破法在霍林河南露天煤矿的应用 |
| 5. | Tentative research on the structure of huolinhe no . 1 opencast coal mine 霍林河一号露天矿构造的初步研究 |
| 6. | Study on eco - environmental water demand in the huolin river basin 半干旱地区霍林河流域径流演变及其影响机制研究 |
| 7. | The dynamic change and trend forecast of land use in the lower huolin river basin 技术在霍林河流域下游湿地景观演变中的应用 |
| 8. | Characteristics and driving forces of wetland changes in middle - lower rreaches of taoer river 以松嫩平原西南部霍林河流域为例 |
| 9. | Optimization on mining techniques for enlarged project of huolinhe no . 1 open pit mine 霍林河一号露天矿扩建工程开采工艺的优化 |
| 10. | Research of the hydrological condition and the exploring on no . 1opencast coal mine of huolinhe 霍林河一号露天矿水文地质条件及采动变化研究 |