| 1. | Stability analysis of sand pile strengthened dock slope protection 环境温度作用下隧道结构变形分析 |
| 2. | Study on prefab concrete lining technology for open trench subway tunnels 地下铁道明挖区间隧道结构预制技术的研究 |
| 3. | Influence of fe2o3 on the tunnelling structure and magnetic properties of zinc ferrite 3对锌铁氧体隧道结构和磁性能的影响 |
| 4. | The tunnel structure itself would be an eyesore , especially with debris being deposited on the roof , creating an unsightly waterfront 隧道结构本身颇为碍眼,尤其是垃圾会堆积在隧道顶部,有碍观瞻。 |
| 5. | Furthermore , the strength of wall rock directly influences the integral stability of tunnel structure and naturally the tunnel sections of well - formed wall rocks embrace good stress and stability 围岩强度的高低直接影响着隧道结构的整体稳定,围岩条件好的隧道断面,其受力以及稳定性都较好。 |
| 6. | Constructing the cwb as an immersed tube tunnel , without reclamation over the top of it , would result in various problems mainly associated with the fact that the tunnel structure would be above seabed level -以沉管隧道方式兴建中环湾仔绕道,但绕道上又不进行填海的话,会引致多个问题,主要因为隧道结构在海床之上。 |
| 7. | Tunnel protective measures would be required to protect the structure from an aggressive marine transport environment and wave action . a physical barrier would be required to protect the tunnel against impact from marine vessels 另外,必须制订适当措施,保护隧道结构免受恶劣的海洋环境和海浪影响,同时,亦须加建屏障,避免隧道被船只碰撞。 |
| 8. | What ’ s more , this paper takes the effect of crown wall rock and mid - board foundation reinforced parametric variation on tunnel structure stress and stability into account grounded on building typical section model of i wall - rock sector 另外,本文还通过建立类围岩地段隧道典型断面模型,分别考虑拱顶围岩和中墙地基加固参数的变化对隧道结构受力和稳定性的影响。 |
| 9. | In order to protect the natural environment of the zone adjacent to mountain of right no . 2 laoshan highway tunnel in nanjing , china , the design of shed - tunnel was adopted through economical and technical comparison 摘要为了保护南京老山二号公路隧道右线傍山段的自然环境,采用锚喷支护与棚洞结构相结合的傍山隧道结构形式,形成互为补充的完整受力体系和边坡防护工程,减小了刷坡范围。 |
| 10. | Based on yulingguan twin - arch tunnel , the author regards the structural design of tunnel as relatively reasonable by virtue of analyzing the results of tunnel field monitoring measurement , while some aspects of tunnel construction still remain to be improved 本文以昱岭关连拱隧道为研究背景,通过对隧道现场监控量测结果分析,认为隧道结构设计较为合理,而隧道施工中存在一些需要改进的方面。 |