| 1. | Stack the risers on the rack with the bop crane 防喷器吊车将隔水管排入管架内。 |
| 2. | Paint mark the top 6 meters of 30 conductor white 隔水管的顶部6米处用白漆涂上记号 |
| 3. | Put the risers in proper position with the crane 用防喷器吊车吊放好隔水管。 |
| 4. | Hoist the risers with the hydraulic running tool 用液压下入工具提起隔水管。 |
| 5. | Load out contractor s riser at zhanjiang anchorage 在湛江锚地把承包商的隔水管装上平台 |
| 6. | Adjust the riser tensioners as required 将隔水管张力装置调整到所需张力。 |
| 7. | B 378 . load out contractor s riser at zhanjiang anchorage 在湛江锚地把承包商的隔水管装上平台 |
| 8. | Set the lmrp on the test stump 将隔水管下部插入总成放到试验桩上。 |
| 9. | Stab the rise onto the pin connector 将隔水管插队入销钉连接器。 |
| 10. | Monitor riser level via trip tank 用计量罐来控制隔水管内的液面 |