| 1. | The most immediate problem is to control the floods . 最紧迫的问题是防洪。 |
| 2. | The town is now counting the cost of its failure to provide adequate flood protection . 该镇未采取适当的防洪措施,现在吃到了苦头。 |
| 3. | Literally thousands of concrete dams are providing water supply shortage, irrigation, flood control, and power generation . 可以毫不夸张地说,有成千上万座混凝土水坝正在供灌溉,给水、防洪、发电之用。 |
| 4. | Character of flood control and project plan in 卫星灌区的防洪特点与防洪工程规划 |
| 5. | Application of gps in surveying of flood control project 在防洪工程测量中的应用 |
| 6. | Main drainage channels and poldered village protection scheme 河道及乡村防洪计划 |
| 7. | Concept innovation in terms of city management 流域防洪规划的观念更新及新技术应用 |
| 8. | Calculation of economic benefits of flood - control projects 防洪工程经济效益的计算 |
| 9. | Expeditiously improving flood prevention and relief work 从速改善防洪救灾工作 |
| 10. | North west new territories village flood protection study 新界西北部乡村防洪措施研究 |