| 1. | In 1969 a (51mm) bituminous concrete overlay was placed on the concrete deck . 1969年在混凝土板上铺设了51mm厚的沥青混凝土铺装层。 |
| 2. | Changes in strand tension can be easily determined if the bridge deck is resurfaced . 当桥面重新铺装时,易于确定钢索内拉力的变化情况。 |
| 3. | General technical conditions for the particle forming machine 刨花铺装机通用技术条件 |
| 4. | Laying of outdoor floorboards square fast laying of floorboards 户外地板方型铺装方法 |
| 5. | Application of steel fibers concrete on bridge deck pavement 钢纤维混凝土桥面铺装的施工应用 |
| 6. | Construction technique of asphalt paving on steel box girder deck 钢箱梁桥面沥青铺装施工技术 |
| 7. | Maintenance rules for air - felting machine 气流刨花铺装机维修规则 |
| 8. | The utilization of lifting electromagnet in coal processing plant 钢纤维混凝土在桥面铺装中的应用 |
| 9. | Accuracy tests of the particle forming machine 刨花铺装机精度 |
| 10. | Polypropylene fiber grid concrete bridge deck research 桥面铺装低掺聚丙烯纤维混凝土耐久性试验与分析 |