English translation for "钢屋架"
|
- steel roof truss
Related Translations:
梯形屋架: trapezoid roof trusstriangular pyramid space grids 空腹屋架: open web roof trussvierendal roof truss 拱形屋架: arch-shaped roof trussarched roof trussarch―shaped roof truss 组合屋架: composite roof trusscomposite roof turss 弓弦屋架: bowstring roof truss 屋架下弦: bottom chord of roof truss
- Example Sentences:
| 1. | Vertical and lateral bending of the steel roof of the deviation should be allowed to meet the norms 钢屋架的垂直度和侧向弯曲的允许偏差应符合规范的规定 | | 2. | Mechanics analysis and safety control of the strutting system in the process of the construction of steel roof truss in national gymnasium project 国家体育馆钢屋架施工过程中支撑体系的受力分析与安全监控 | | 3. | It should be coated on the steel surface . also can be used to protect the flammable fitment material . this product meets the national normal demand about fire prevention code 用途:广泛用于工业与民用建筑物如体育馆、飞机场等轻钢屋架,涂覆于钢材表面,满足国家有关防火规范的要求。 | | 4. | This artical inquires into the buckling shape and effective buckling length both in and out of plane for a compression diagonal with rectangle hoop in the steel light roof trusses which are shuttle in shape 摘要探讨了腹杆带有矩形箍的梭形轻型钢屋架受压腹杆平面内和平面外失稳形态、腹杆稳定性计算长度、连接受拉与受压腹杆的矩形箍的作用及其对稳定性的影响。 | | 5. | Based on the forces obtained above for steel - roof system of the workshop , several strengthening schemes are proposed . all of the strengthening schemes are compared technically and economically by considering such factors as the construction method , the site situation , construction period and strengthening result , one rational scheme is selected finally . the strengthening design and construction are implemented successfully 针对厂房钢屋架体系,提出多种加固方案,在考虑了施工方法、现场条件、施工周期及加固效果等因素的基础上,对各种加固方案进行综合技术分析,选择了一种合理的加固方案,并成功的实施了加固设计及施工。 | | 6. | Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50 , 000m2 , two 30 - story buildings ) , worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ) , worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant , 50 , 000m2 , worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing , analysis and consultations of nanjing international conference and exhibition center , site - erected structure , 75m span steel roof truss ( the largest one in china ) , worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing , analysis and update technology of the reliability of the joints of intermediate floor slabs , beams and columns of base beam of sanshanjie station of nanjing metro " etc 完成"江苏新大都广场( 5万多平方米,二幢30层) "建设监理咨询(总监) ; "锡澄高速堰桥跨线服务区(国内首座) "建设监理咨询(总负责) ; "淮阴卷烟厂9 . 5技改项目( 5万多平方米) "建筑监理咨询(总负责) ;主持了"南京国际会展中心75m跨钢屋架(国内最大距)现场施工安装结构安全性测试分析咨询" ; "南京地铁三山街站中楼板及底板梁柱节点构造技术安全可靠性的测试分析与技术改进咨询服务"等项目。 | | 7. | Limited company of adornment of wall of hua guang act of lukewarm state city is with production , design , construction wall of large glass act , granite does the wall that hang act , aluminous model the building act wall such as board act wall and daylighting top , gauze wears project of project of roof tuss of project , light qualitative steel , steel structure , 97 people of existing worker , among them title of high school class 48 people , fixed assets many yuan 500 温州市华光幕墙装饰有限公司是以生产、设计、施工大型玻璃幕墙、花岗岩干挂幕墙、铝塑板幕墙等建筑幕墙及采光顶、金属网架工程、轻质钢屋架工程、钢结构工程、铝合金门窗、塑钢门窗等林型金属结构工程以及建筑内外墙涂料施工的专业公司,现有职工97人,其中高中级职称48人,固定资产500多万元。 | | 8. | The main work of this paper was as fellows : ( 1 ) generalized the development of pre - stressed steel structure in our nation and abroad , and pointed out the main problem in practice ; ( 2 ) presented the mechanism of pre - stressed steel structure and revealed its applicable range ; ( 3 ) established the optimization design model for pre - stressed steel structure , which accounts for constraints on stresses and displacements of structure ; ( 4 ) brought forward the optimization design method , which combined linear programming and the principle of full restriction , through which we can obtain the magnitude of each time pre - stress and the optimized sections of each members of structure ; ( 5 ) analyzed the best times of pre - stress and pointed out that 2 ~ 3 times is preferable ; ( 6 ) conducted optimization design on large - space steel roof , horizontal parallel steel truss with local cables , horizontal parallel steel truss with global cable , and ultra - static steel truss , the result of which indicated that the multiple pre - stress structure is very economic ; ( 7 ) compared different schemes of cable placement for horizontal parallel steel truss , and the results showed that the local cable only unloaded the second girders , but had no response on the first girders and stomach poles , while global cable could unload the second girders and the stomach poles outside of turning point of cable , thus proving that global cable is more economic than local - cable 本文的主要工作是:对国内外预应力钢结构的发展历史及现状作了综述和总结,指出当前预应力钢结构工程实践中存在的主要问题;阐述了预应力钢结构的受力机理,并指出预应力钢结构的适用范围和特点;在考虑结构应力和变位约束的条件下,建立预应力钢结构优化设计模型;提出多次预应力钢结构优化设计方法和步骤,采用线性规划和满约束准则相结合的优化方法,可优化设计出施加的每一级预应力的大小,并得到结构各部分的优化截面;对多次预应力最佳的施加次数作了分析,并建议以2 3次为宜;为验证文中理论和方法,分别对大跨多次预应力钢屋架、局部布索的水平平行弦钢桁架、整体布索的水平平行弦钢桁架和局部布索的超静定钢桁架等算例进行了优化设计,经济效益明显;对水平平行弦钢桁架的几种施加预应力的方案进行比较,对于局部布索,预应力只对下弦起到卸载作用,对上弦和腹杆基本不起作用;而整体布索预应力除对下弦卸载外,对索折点以外部分腹杆也起到卸载作用,经济效益好于局部布索。 |
- Similar Words:
- "钢桅" English translation, "钢桅杆" English translation, "钢围堰" English translation, "钢围囹" English translation, "钢蜗壳" English translation, "钢屋架结构" English translation, "钢屋面材料" English translation, "钢系船桩" English translation, "钢霞正长岩" English translation, "钢纤维" English translation
|
|
|