| 1. | A test load was applied to the girder . 一个试验载荷作用于该梁上。 |
| 2. | Find the load carried by each of the supports . 求每个支点所承受的载荷。 |
| 3. | The load reaches a maximum and then drops down . 载荷在达到最大值后下降。 |
| 4. | Load p varies from 90, 000 n to 45, 000 n . 载荷P由90,000N变化到45,000N。 |
| 5. | Secondly it is necessary to define the applied load . 其次,需要确定所作用的载荷。 |
| 6. | The equivalent loading is shown in fig. 1-24(d) . 图1-24(d)则表示出了相应的载荷。 |
| 7. | The warhead is the missile's payload, or cargo . 战斗部是导弹的有效载荷,即运载物。 |
| 8. | The payload of a ballistic missile is its warhead . 一枚弹道导弹的有效载荷是它的弹头。 |
| 9. | In this section we discuss the longitudinal load effects . 在此,我们讨论纵向载荷影响。 |
| 10. | Find the angular deformation sustained with such loading . 求在这种载荷下出现的角变形。 |