Mobile
Log In Sign Up
Home > chinese-english > "窝工" in English

English translation for "窝工"

[ wōgōng ] 
enforced idleness due to poor organization of work; down time; holdup in the work through poor organization; holding up the work; lay up workers

Related Translations:
窝工差异:  idle activity variance
刨窝工:  hitch cutter
窝工时间:  down timeidle hoursidle periodidle timetime out
窝工费用:  expense of idleness
机器窝工时间:  machine idle time
Example Sentences:
1.Himmler has been very gracious about the stalled dam .
希姆勒对那道窝工的坝表现出非常通情达理的态度。
2.Where the developer fails to timely conduct inspection , the contractor may extend the relevant project milestones , and is entitled to claim damages for work stoppage or work slowdown , etc
发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。
3.Provided that the developer does not interfere with the normal operation of the contractor , it may inspect the progress and quality of the work at any time
第二百七十八条隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。
4.Where the construction project caused personal injury and property damage during its reasonable usage period due to any reason attributable to the contractor , the contractor shall be liable for damages
第二百八十三条发包人未按照约定的时间和要求提供原材料、设备、场地、资金、技术资料的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。
5.Where the developer fails to provide raw materials , equipment , site , funds , or technical information at the prescribed time and in accordance with the contractual requirements , the contractor may extend the relevant project milestones , and is entitled to claim damages for work stoppage or slowdown , etc
第二百八十三条发包人未按照约定的时间和要求提供原材料、设备、场地、资金、技术资料的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。
6.If an ongoing project is stopped or delayed due to any reason attributable to the developer , the developer shall take the appropriate measures to make up or mitigate the loss , and shall indemnify the contractor for its loss and out - of - pocket expenses arising from resulting work stoppage , slowdown , reshipment , re - dispatch of mechanical equipment , and excess inventory of materials and assemblies , etc
第二百八十四条因发包人的原因致使工程中途停建、缓建的,发包人应当采取措施弥补或者减少损失,赔偿承包人因此造成的停工、窝工、倒运、机械设备调迁、材料和构件积压等损失和实际费用。
Similar Words:
"窝夫烘烤模" English translation, "窝夫面饼" English translation, "窝夫斯堡" English translation, "窝夫岬" English translation, "窝伏尔组件" English translation, "窝工差异" English translation, "窝工费用" English translation, "窝工时间" English translation, "窝弓擒虎" English translation, "窝弓药箭" English translation