| 1. | Example of development of cutterhead of shield machine 盾构掘进机刀盘研制实例 |
| 2. | Mould installation and debugging of segment of shield machine 盾构管模的安装与调试 |
| 3. | Hydraulic variable speed drive system of shield disk cutter 盾构刀盘变转速液压驱动系统 |
| 4. | Factors affecting joint stiffness of shield tunnel lining 影响盾构隧道衬砌接头刚度的因素 |
| 5. | Standard form of specifications of shield machine 盾构机规范的标准格式 |
| 6. | Design analysis of cutterhead for combined shield machine 复合型盾构掘进机刀盘的设计分析 |
| 7. | Fuzzy algorithm for control of shield machine 盾构姿态的模糊控制方法 |
| 8. | Finite eiement analysis of the construction of shield tunneling 盾构隧道施工过程的有限元分析 |
| 9. | Study on high performance concrete of precast shield segments 预制盾构管片的高性能混凝土研究 |
| 10. | Application of shield tunneling method in beijing metro line 盾构法施工在北京地铁5号线的应用 |