| 1. | The successful alternative was the cast-in-place segmental prestressed concrete box girder . 最后采用的方案是分段现浇的预应力混凝土箱形梁。 |
| 2. | Study on the joints of reinforced concrete plate 现浇钢筋混凝土楼板裂缝的成因及防治 |
| 3. | Research on commercial concrete shrinking in site plates 现浇商品混凝土楼板收缩变形研究 |
| 4. | Cast - in situ concrete slab column structureokok . org 现浇板柱结构 |
| 5. | Construction technique for cast - in - situ continuous hollow - slab beam 现浇连续空心板梁施工技术 |
| 6. | An exploitation into the problom of cracks in pouring concrete floor 现浇钢筋砼楼面裂缝问题的探讨 |
| 7. | The monitoring of cracks of floor slab at construction stage 现浇混凝土楼板裂缝的施工阶段试验研究 |
| 8. | Construction method of pouring concrete pre - stressed connection beam 现浇预应力混凝土连系梁施工方法 |
| 9. | Techique of pumping concrete used in high pier construction 钢管桩和贝雷片支架在现浇箱梁施工中的应用 |
| 10. | Study of u shaped girder with pre - cast main beam and cast in - situ slab 预制主梁现浇道床板的槽形梁研究 |