Mobile
Log In Sign Up
Home > chinese-english > "炼钢炉" in English

English translation for "炼钢炉"

steel-smelting furnace

Related Translations:
喷气炼钢:  pneumatic steel
平炉炼钢:  martin process
鼓风炼钢:  air-blown pneumatic steelmaking
转炉炼钢:  converter steelmakingpneumatic steelmaking
氧气炼钢:  oxygen steelmaking
英国炼钢:  british steel
双炼钢:  duplex steel
炼钢工:  steel smeltersteelmaker
炼钢工人:  steel workersteelworker
电炉炼钢:  electric furnace steelmakingelectric steel heatelectric steelmakingelectrosmelting of steel
Example Sentences:
1.Arc steel - making stove ' s electrode elevating control system
电弧炼钢炉电极升降智能控制系统
2.High frequency steel furnace
高频炼钢炉
3.Equally significant is the reduction in the power required to run the furnaces using the new waste plastic injection technology
它的重大意义就是通过使用新的废弃塑料注入工艺来减少炼钢炉运转需要的能量。
4.Pictures of steelmaking unit steelmaking furnace , continuous caster , steel structure and so on are represented to make you understand well
公司席此展示炼钢设备炼钢炉连铸机轧钢机及钢结构等图片,便于客商充分认识和了解。
5.Beginning from the thermodynamics condition in the arc furnace and ladle , the anticipated goal was achieved by improving smelt process
炼钢炉内和钢包内脱磷热力学条件入不敷出手,对该公司的炼钢现状进行了工艺改进,达到了预期的目的。
6.Senior advisor of company , is the first drafter of the arc furnace transformer standards and the copy writer of the only domestic works onfurnace transformers as amember of bational transformer standardization committee and editoral com - missioner of magazine transformers
高级顾问张懋鲁高级工程师为全国变压器标准化委员会委员变压器杂志编委,是炼钢炉变压器标准的第一起草人,是国内唯一电炉变压器著作的撰稿人。
7.Scrap steel will be loaded into steelmaking furnace and molten after sieving and dewetting . if the chemical composition and target temperature of molten steel are satisfied , the molten steel will be poured into ladle and conveyed to continuous caster , then be made as billet with specified length
废钢铁经筛选去湿,装入炼钢炉冶炼融化成钢水,当达到要求的化学成分及温度目标值时,将钢水倒入钢水包,送至连铸机,浇铸成定尺长度的钢坯
8.Steel casting : 20 tons arc - furnace steelmaking , 40tlf refiner furnace ; the max elevating capacity 125t ; the max casting products 80t , dimension of casting products length , width , high 8 . 54 . 53m , spun casting min outer diameter , min wall thickness , max length 1000154000mm ; various specification steel strands
铸钢: 20t电弧炼钢炉40tlf精炼炉最大起重能力125t最大铸钢件80t铸钢件最大尺寸长宽高8 . 54 . 53m离心浇注最大外径最小壁厚最大长度1000154000mm各种规格连铸坯。
9.Qualified molten steel from the steelmaking furnace will be contained in ladle and conveyed to continuous caster , poured into crastyllizer through pouring basket , then handled with the processes of vibration , water spraying cooling , straightening , roll conveying , flame cutting , and cooling on cooling bed , finally the formed billets will be stored at the stockyard or directly sent to the heating furnace of rolling mill for heating
炼钢炉冶炼出合格的钢水,用钢水包送至连铸机,经中间包浇注到结晶器,再经振动水喷淋冷却拉矫辊道输送火焰切割冷床冷却,最后存放于钢坯堆放区或直接送至轧钢机加热炉进行加热。
Similar Words:
"炼钢工人用带玻璃罩的帽子" English translation, "炼钢工业" English translation, "炼钢工业生产能力" English translation, "炼钢合金剂" English translation, "炼钢连铸比" English translation, "炼钢炉, 吹风转炉" English translation, "炼钢炉平顶" English translation, "炼钢炉渣" English translation, "炼钢炉主厂房" English translation, "炼钢平炉炉渣磷酸体" English translation