| 1. | A major vertical fault scarp formed during the earthquake was less than 1000 ft from the spillway . 地震时形成的一个主要的垂直断层崖,离溢洪道不到1000英尺。 |
| 2. | The studies may indicate that an earthfill dam with a center concrete gravity overflow spillway section is the most economical, in a wide flat valley . 方案表明,在宽阔而平坦的河谷内,一种在中间段设置混凝土重试溢洪道的土坝是最经济的。 |
| 3. | Hydraulic model test of spillway in baiyinhua reservoir 白音花水库溢洪道水工模型试验研究 |
| 4. | Design of spillway in quting reservoir 曲亭水库溢洪道工程设计 |
| 5. | Design specification for river - bank spillway 溢洪道设计规范 |
| 6. | The calculation results verified the feasibility of the flexible spillway 从而验证了柔性溢洪道的可行性。 |
| 7. | Research on the jet bucket shape of spillway of lan du water project 兰督水利枢纽溢洪道挑流鼻坎体型试验研究 |
| 8. | Uncontrolled crest spillway 无闸门控制的溢洪道 |
| 9. | Slipform construction of songshan spillway weir gate pier on songjianghe river 松江河松山溢洪道工程堰首闸墩滑模施工 |
| 10. | Study of the high - speed flow through the spillway of the shuibuya water control project 水布垭溢洪道高速水流问题研究 |