| 1. | The conference was to be held in the underground bunker, a cold, damp, airless shelter lined with concrete . 会议将在一个用混凝土衬砌的地下掩体里举行,那里阴暗湿冷而且空气稀薄。 |
| 2. | Displacement - based method for reliability analysis of shotcrete lining of tunnel 隧道喷混凝土衬砌结构可靠度分析的位移方法 |
| 3. | Gunite concrete lining 喷射混凝土衬砌 |
| 4. | Study on precast technique for concrete segmental tube applied to double circle shield construction 双圆盾构混凝土衬砌管片预制技术的研究和应用 |
| 5. | The durability for concrete lining structure of highway - tunnel and the thickness of concrete cover 公路隧道混凝土衬砌结构的耐久性与保护层厚度 |
| 6. | Optimization design of tailrace surge chamber concrete lining layers for dachaoshan hydropower station 大朝山水电站尾水调压室混凝土衬砌分层优化设计 |
| 7. | The monitoring and measurement of wet shotcreting polypropylene fiber net lining in the experimental part of dongjusigou tunnel 东巨寺沟隧道纤维喷混凝土衬砌效果监测 |
| 8. | The practice shows that it is effective to decrease the cracking of the concrete lining slab through the active adoption of those measures 实践证明:通过采取积极的预防及控制措施,对减少混凝土衬砌板裂缝的产生是非常有效的。 |
| 9. | There are two lining structure types which are frequently used in engineering presently , one is the reinforced concrete lining , another is the steel lining encircled by concrete 摘要目前工程上比较常用的水电站调压井衬砌结构型式有两种,一种结构型式是钢筋混凝土衬砌结构型式,另一种结构型式是钢衬加回填混凝土衬砌结构型式。 |
| 10. | During the construction of the concrete lining for the diversion tunnel of xiaowan hydropower station , the concrete linings for the sides and the crown of the tunnel are simultaneously placed by the integral steel shuttering trolley with the greatly shortened construction progress 摘要小湾水电站工程在导流洞混凝土衬砌施工中,边顶拱混凝土采用整体式钢模台车一次衬砌成形,大幅提高了施工进度。 |