| 1. | A scheme on the erection of 50m concrete box girder in hangzhou bay bridge 双幅混凝土箱梁运架方案探讨 |
| 2. | Probe into the construction techniques of prestressed concrete box girder 预应力混凝土箱梁施工工艺探讨 |
| 3. | An analysis on quality in construction of poured - in place concrete box girders 现浇混凝土箱梁施工质量浅析 |
| 4. | Temperature field and stress field of prestressed concrete box - girder bridge 预应力混凝土箱梁桥的温度场和应力场 |
| 5. | Cause analysis on cracks of inherent stress concrete box - beam and its prevention 预应力混凝土箱梁裂缝成因分析及处治 |
| 6. | Analysis of construction stage shrinkage stress and cracking of concrete box girders 混凝土箱梁桥施工阶段收缩应力及开裂现象分析 |
| 7. | Experimental study on the long - term behavior of concrete box girders prestressed with external cfrp tendons 筋预应力混凝土箱梁长期受力性能试验研究 |
| 8. | Analysis of temperature influence on long - span continuous rigid frame bridge construction control 广东虎门辅航道连续刚构桥混凝土箱梁的温度梯度研究 |
| 9. | Closure construction of long prestressed concrete rigid frame - continuous girder bridge with multi - span 大跨连续刚构桥预应力混凝土箱梁的长期挠度预测探讨 |
| 10. | Construction technique of transforming simply - supported 70 m - span prestressed concrete box girders into continuous ones in hbocb 预应力混凝土箱梁简支变连续施工技术 |