| 1. | Temporary works for slope rw44 near cheung sha 继续于长沙的挡土墙编号44进行临时泥钉的工程 |
| 2. | Soil nails at retaining wall rws5 in progress 挡土墙所采用的临时泥钉 |
| 3. | Stage one involved the installation of temporary soil nail 第一阶段主要进行暂时性泥钉工程。 |
| 4. | Safety of slopes which used soil nails 使用泥钉的斜坡的安全问题 |
| 5. | Commence drilling at bay7 of rw18 - 1 construction of noise barrier footing nb 挡土墙所需的临时泥钉工程 |
| 6. | Drilling of soil nails for slope no . dc30 near the afcd office 邻近于渔农自然护理署进行dc30斜坡的泥钉钻孔工程 |
| 7. | Drilling temporary soil nail for retaining wall no . 44 at cheung sha 于长沙的挡土墙编号44进行临时泥钉钻孔的工程 |
| 8. | Continuation of construction temporary works for retaining wall no . 44 , above south lautau road near cheung sha 继续邻近于长沙屿南道的挡土墙编号44进行临时泥钉钻孔的工程 |
| 9. | Continuation of construction of temporary works for retaining wall no . 44 , above south lautau road near cheung sha 继续邻近于长沙屿南道的挡土墙编号44进行临时泥钉钻孔的工程 |
| 10. | Soil nailing near wsd catchwater has been completed and grouting for piling at the central pier of bridge no . str17 will commence 邻近于长沙引水道的泥钉工程经已完成,与及将会为桥编号str17的中间桥墩展开桩柱灌浆的工程 |