Mobile
Log In Sign Up
Home > chinese-english > "河道疏浚" in English

English translation for "河道疏浚"

channel dredging
channelization
river dredging
riverdredging
training of channel
training of river channel


Related Translations:
疏浚过的码头:  dredged wharf
河道上游:  upper course
河道摆动:  wandering of river
河道站:  river station
整治河道:  river regulation
船运河道:  ship canal
河道展宽:  channel widening
河道控制:  shifting control
河道动态:  river movement
原有河道:  original river
Example Sentences:
1.The dispute over the sovereignty of huangpu river in modern china
近代黄浦江河道疏浚的主权之争
2.Jiayu construction providing water main design and construction of the municipal construction , river dredging , hydropower installation / handling , steel fencing , security doors manufacture , sewage wastewater transport , construction materials , interior decoration materials disposal , metal processing components
上海嘉宇水利建设工程有限公司主要提供水利工程设计,市政工程的建设施工,河道疏浚,水电安装/装卸,钢质栅栏,防盗门制造,污水废水运输,建材,装潢材料的批售,金属构件加工。
3.Due to issues of dongting lake districts flood composition , the evolution of sediment flow , the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering , the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level , the flow capacity , the speed of flow and changes of flow field after implemented the project , which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course , canal and harbor and river course - dredging engineering
摘要针对洞庭湖区的洪水组成、水流泥沙演变、河道湖泊水系分布特点以及河道湖泊疏浚工程布局情况,利用gis技术模拟洞庭湖地形变化,采用有限体积法建立了湖泊二维水力学计算模型预测疏浚工程实施后的水位、流量、流速流场变化,为河道、航道港口整治、河道疏浚清淤等工程决策与实施提供了可靠理论依据。
4.By analyzing on nature , society and economy conditions as well as distribution characteristics of sand source in the lower lhasa river valley , put forward a series of comprehensive renovation scheme to harness sand sources , mainly including dredging channel , planting farmland shelter - forest network , constructing arbor - bush - herb shelter forest and shifting sand stabilization , this scheme will not only control blown - sand threat , and improve local ecological environment ; at the same time , also lay the strong foundation for enlarging lhasa city space and effectively utilizing local resource , embody a sustainable thought on how to make comprehensive renovation in high cold valley region
摘要在深入分析本区自然社会经济条件和风沙源分布特征基础上,提出把拉萨河下游河道疏浚与风沙源治理相结合,以河道疏浚、农田防护林、乔灌草防风护沙林和流沙固定等物理工程、生物和机械措施为主体,进行风沙源综合整治,一方面可有效控制风沙灾害的威胁,改善河谷区生态环境,同时为拉萨市城市空间发展和当地资源的有效利用奠定了基础,体现了在高寒河谷区进行风沙源综合整治的可持续性思路。
Similar Words:
"河道容量" English translation, "河道砂" English translation, "河道上的水库" English translation, "河道上游" English translation, "河道设施" English translation, "河道疏浚工程" English translation, "河道束窄" English translation, "河道束窄段" English translation, "河道束窄工程" English translation, "河道数据" English translation