| 1. | The station is scheduled for completion by the end of 2004 乌溪沙站预计于二零零四年年底落成。 |
| 2. | Wu kai sha station will be the northern terminus of mos rail 乌溪沙站是马铁的北行终点站,位于利安 |
| 3. | Wu kai sha station 乌溪沙站 |
| 4. | Wu kai sha station is the northern terminus of mos rail . it is located at the eastern periphery of lee on estate 乌溪沙站是马铁的北行终点站,位于利安?东端。 |
| 5. | Upon completion of the new extensions , it will take around 27 minutes to travel from wu kai sha station to east tsim sha tsui station 当新支线落成后,由乌溪沙站前往尖东站只需大约二十七分钟。 |
| 6. | Public transport interchange will be built to the south of wu kai sha station , providing ground - level pedestrian access to the station 乌溪沙站以南将设有公共交通交汇处,乘客可利用地面行人通道进出车站。 |
| 7. | A public transport interchange will be built to the south of wu kai sha station , providing ground - level pedestrian access to the station 乌溪沙站以南将设有公共交通交汇处,乘客可利用地面行人通道进出车站。 |
| 8. | " ma on shan rail " means the railway operated by the corporation between tai wai station and wu kai sha station and any extensions thereof “马鞍山铁路”指本公司营运的行走于大围站与乌溪沙站之间的铁路及其任何支线; |
| 9. | Pwsc endorsed a commitment of 92 . 1 for the design and construction of two public transport interchanges at tai wai station and wu kai sha station of mos rail 工务小组委员会通过9 , 210万元的承担额,用以为马铁的大围站及乌溪沙站设计并兴建两个公共运输交汇处。 |
| 10. | Pwsc endorsed a commitment of $ 92 . 1 for the design and construction of two public transport interchanges at tai wai station and wu kai sha station of mos rail 工务小组委员会通过9 , 210万元的承担额,用以为马铁的大围站及乌溪沙站设计并兴建两个公共运输交汇处。 |