| 1. | Figure 3 - immersed tube tunnel option - above seabed 图3 -沉管隧道方案在海床之上 |
| 2. | Problems needing attention in survey of immersed tunnel 沉管隧道测量中值得注意的几个问题 |
| 3. | Calculation methods for settlements of immersed tunnels induced by tidal load 潮汐荷载引起沉管隧道沉降计算方法 |
| 4. | Immersed tube tunnel options 沉管隧道方案 |
| 5. | The numerical results provide references for preliminary design of the tunnel 计算结果为长江沉管隧道的初步设计提供了参考依据。 |
| 6. | Immersed tube tunnel 沉管隧道 |
| 7. | The foundations of the cwb tunnel cause further constraints to immersed tube tunnel construction -中环湾仔绕道隧道的地基,对建造沉管隧道构成进一步的限制。 |
| 8. | Research on the underwater grouting plan of soft ground treatment on caisson tunnel cross yangzhi rever in nanjing 南京过江沉管隧道软基处理水下注浆方案探讨 |
| 9. | Figure 4 - immersed tube tunnel option - below seabed , profile between pla berth and central reclamation phase i 图4 -沉管隧道方案在海床之下,地铁荃湾线的剖面图 |
| 10. | Then , the stress state on adapter between two immersed tubes is calculated based on 3 - d finite element method 并采用三维有限元拟静力方法,对沉管隧道接头受力状态进行分析计算。 |