| 1. | Practices on dynamic water grouting and sealing in coal mine 煤矿井下动水注浆堵水实践 |
| 2. | Open test cock 3 and allow water to fill the tube to the top 开启测试旋塞3号,使得水注到管子的顶部。 |
| 3. | Make sure to top up the water level so that is always remains the same 一定要把水注满使水平高度总保持不变。 |
| 4. | Study of grouting plug - back material for karst crevice - water of xinqiaomine 新桥矿岩溶裂隙水注浆封堵材料的研究 |
| 5. | The steam and water volumes occupy the top half and bottom half of the pressuriser respectively during normal operation 稳压器上半部为蒸气空间,下半部被水注满。 |
| 6. | The steam and water volumes occupy the top half and bottom half of the pressuriser respectively during normal operation 稳压器上半部为蒸气空间,下半部被水注满。 |
| 7. | To deal with the water shortage , las vegas sends some of its used water back into the colorado river to use again 为了解决水资源短缺问题,拉斯维加斯将一部分用过的水注回科罗拉多河循环利用。 |
| 8. | But now , succeasful application for the pre - stress anchor technique in the same case has been gained by use of one construction method of orifice ponding pouring in the deep excavation pit supporting in xiamen postal edifice , which can be taken for example on similar engineerings 在厦门邮电大厦探基坑支护的预应力锚杆工程中,采用一种“孔口堵水注浆”的施工方法,取得成功,可为类似工程提供借鉴。 |